Infrastructure
As of the academic year of 2018-2019, the infrastructure facilities of our Vocational School:
At Bergama Yusuf Perin Campus; Two buildings with 5000 square meters of indoor space and these buildings;
- 20 classrooms
- Two conference rooms with 280 and 70-seater sound system
- 1 Computer Laboratory with 30 computers
- 2 Computer Laboratory with 40 computers
- Garment manufacturing Technology CAD Computer Laboratory with 15 computers
- Electronic Automation Laboratory with 15 computers
- Restoration - Conservation Laboratory
- Mushrooms Laboratory
- Greenhouse Laboratory
- Air Conditioning - Refrigeration Laboratory
- Textile-Clothing Workshop
- Technical Drawing Laboratory
- Animation Studio
- Library with over 1000 books on various topics
Outside the building in 145 ha of land;
- EGETAL Agricultural Analysis Laboratory
- Fully equipped 1250 square meters mushroom production plant
- 4 vegetable, ornamental plants, cutting flower greenhouses, with 1000 square meters of technological features and fully equipped
- Field vegetable production and test areas
- Olive grove with 2000 drip irrigation system
- 200 square meters Restoration - Conservation work platform
- Two floors and a canteen with 400 square meters of floor space
- Security Point
- Basketball and Volleyball Field.
- 280kVA generator that can provide electricity for all buildings
In addition, there is a KYK dormitory where 250 male + 250 female students can stay, the construction of which was started in 2020 by the T.C. Ministry of Youth and Sports, and the estimated completion time was given as 2022.
Number of Students
Academic staff
- 1 Professor
- 2 Assoc. Professor
- 4 Assis. Professor,
- 3 Doctor Lecturer,
- 10 Lecturer,
- 2 Research Assistant,
Administrative Staff
- 10 Officer,
- 2 Technician,
- 1 Officer Auxiliary Services,
- 13 Company personnel
- 7 Security